Category: Info for Students

  • Equipment Rental Terms and Conditions

    By receiving Sheridan’s rental equipment for your program and year of study, you, as the “Renter” (whose name appears in the Rented To field on the Rental Contract) are responsible for paying the program fees as listed on your account summary in MyOTR Service (https://myotr.sheridancollege.ca/). In the same way, the Renter is responsible for keeping…

  • CER General Pool Equipment

    Available to Students of FAAD Programs The Central Equipment Room offers access to a general pool of equipment for students actively enrolled in any FAAD program. The loaning of this equipment is intended exclusively for student assignments and projects and not for personal use. Students should familiarize themselves with the Equipment Rental Terms & Conditions…

  • VEFF Equipment Rental Request Form (Fall/Winter 2023-2024)

  • How to Submit a Room Booking Request Using the Facility Booking Portal (VimBiz Web)

    VimBiz is the Sheridan database system for organizing and tracking everything from the borrowing of equipment to the booking of on-campus facilities (classrooms/studios/labs) for classes, assignments and productions. The VimBiz Web Facility Booking Portal is the web-based tool for students and faculty to create and manage room booking requests. Please review the following instructional video…

  • Equipment Loan Strike and Rental Extension Policies

    Late Return Strike Policy and Rental Extensions Sep. 2022 All Sheridan equipment centres manage the distribution of thousand of pieces of equipment to FAAD programs. This equipment is used on a daily basis in classes by faculty, and for assigments and projects by eligible students. It is imperative that the equipment on loan (the rental)…

  • Faculty Requesting Extended Equipment Rental Periods for Students

    Long Duration Rentals for Students Sep. 2022 Equipment rentals to students of most FAAD programs are limited to 3 business days. In some cases students might require equipment loans/rentals for longer than 3 days for specific projects and assignments. In this case the equipment room managing the required equipment must be provided specific information and…